Freestanding white modular hardwall cleanroom structure with view windows and a walkable deck installed inside a building

Modular Cleanrooms for a Compounding Pharmacy: MFV Pharmacy, Sandy, Utah

MFV Pharmacy needed controlled compounding space inside an existing building in Sandy, Utah. Labs USA supplied a two structure modular hardwall cleanroom system with pass through chambers, view windows, and a load rated walkable ceiling deck, built offsite and assembled in place.

Two adjoining white modular hardwall cleanroom structures with view windows installed inside a pharmacy building

The Situation

MFV Pharmacy is a compounding pharmacy in Sandy, Utah. Compounding means preparing medications to order rather than dispensing them from a manufacturer’s packaging, and the environment that work happens in is part of the product. Air cleanliness, pressure relationships between rooms, surface finishes, and the way people and materials move in and out all sit inside the pharmacy’s quality system, not just its facilities budget.

The pharmacy had the building. What it did not have was controlled space inside that building. The existing shell was a conventional structure with a high open ceiling, and the compounding operation needed a defined set of rooms with smooth cleanable surfaces, controlled openings, and a ceiling plane that could carry filtration and lighting. Two distinct areas were needed rather than one, so that different classes of work could be separated with their own entries and their own material transfer points.

Building that conventionally means stud walls, drywall, taping, sanding, painting, sealing, and a long list of trades running through an occupied pharmacy for months. Every one of those steps generates dust in a place that has to end up clean, and every one of them ties up floor space that is producing nothing while the work continues. Drywall construction is also permanent. If the pharmacy grows, changes what it compounds, or moves buildings, that investment stays behind.

There was a structural requirement too. The pharmacy wanted the tops of the rooms usable, with a deck able to carry mechanical equipment and the weight of a technician walking on it for filter and service access, rather than a lightweight lid that has to be worked around from a ladder every time something above the ceiling needs attention.

The Solution

Labs USA supplied a modular hardwall cleanroom system: two connected prefabricated structures built from insulated wall panels on a steel frame, engineered as a package and assembled inside the existing building. The panels arrive finished. There is no taping, sanding, or painting on site, so the wet and dusty part of conventional construction never happens in the pharmacy at all.

Stainless steel double door pass through chamber set into a white cleanroom wall panel beside a large view window
Pass through chambers move materials between areas without opening a door.

Two pass through chambers were built into the wall panels. A pass through is a small double door cabinet set through the wall, interlocked so both doors are never open at once. Materials go in one side and come out the other, which means a tray of supplies can cross from one classification of space to another without a person walking through with it and without a door opening onto the room. In a compounding pharmacy that single detail removes a large share of the everyday traffic that would otherwise disturb the controlled environment.

The two structures were laid out with different ceiling heights, so each area suits the work and the equipment above it rather than forcing one dimension across the whole footprint. Wall panel junctions were engineered as three way and four way connections where rooms meet, which is how a modular system produces interior partitions and separate rooms instead of one open box.

Sight lines were a deliberate part of the specification. Full height and partial view windows were built into the panel runs, along with a sliding window, so supervisors and technicians can see into and across the controlled areas without entering them. Standard single doors and a double door opening handle personnel access and equipment movement, and a fixed ladder gives safe access to the deck.

Above the rooms, the system uses a structural deck rather than a suspended ceiling. The deck is built from steel decking with a tempered walking surface and is engineered for a uniform live load, so it supports filtration modules, lighting, and the weight of a technician performing service. That turns the top of the cleanroom into usable service space and keeps filter changes and mechanical work out of the clean space below.

Electrical rough in was integrated into the panels: standard and quad receptacles, ground fault protected outlets, light fixtures, and switches are all part of the package, so the interior is finished rather than a shell waiting on another trade. The result belongs to the cleanroom systems family Labs USA supplies, in its modular hardwall form.

Features

🏦

Two Connected Structures

Separate controlled areas with their own entries, joined as one engineered system.

🧿

Insulated Wall Panels

Factory finished panels with smooth cleanable faces and no site painting or taping.

🔒

Pass Through Chambers

Two double door pass throughs so materials cross between areas without a door opening to the room.

📺

View and Sliding Windows

Full and partial windows plus a sliding window for supervision and controlled handoffs.

🛠

Walkable Ceiling Deck

Steel deck with a tempered walking surface, engineered for a uniform live load.

💡

Integrated Electrical

Lighting, switches, standard and quad receptacles, and ground fault protected outlets built in.

Advantage

The realistic alternatives for creating clean compounding space in an existing pharmacy are stick built construction, a softwall enclosure, or a modular hardwall system. Stick built gives permanence but costs the most disruption: multiple trades, dust generation inside an operating pharmacy, a long schedule, and a structure that cannot be moved or reconfigured afterwards.

A softwall enclosure, with curtain walls hanging from a frame, is fast and inexpensive. It suits temporary or low classification work, but curtains flex, they are harder to keep clean at seams and hems, and they do not give a pharmacy the rigid, wipeable, defensible surface it wants where sterile preparation happens. They also cannot carry a walkable deck.

Modular hardwall sits where this project needed it. The panels are rigid and cleanable like a built wall, the structure is engineered as one system with its own frame and deck, and it is demountable. If the pharmacy expands, changes what it compounds, or relocates, the rooms come apart and go back together in the new configuration rather than being demolished. For a business whose building may change before its process does, that is a materially different asset than drywall.

Labs USA specifies all three approaches, along with laboratory casework, fume hoods, and exhaust snorkels for the work that happens inside them, so the recommendation follows the process rather than a single product line.

Benefits

  • Controlled compounding space created inside an existing building with no shell construction
  • Factory finished panels, so no drywall dust, taping, sanding, or painting inside the pharmacy
  • Two separated areas with their own access and their own material transfer points
  • Pass through chambers cut personnel traffic across controlled boundaries
  • Windows let supervisors see the work without entering the space
  • A load rated walkable deck keeps filter and mechanical service above the clean rooms
  • The system is demountable and reconfigurable rather than a permanent write off
Interior of a pharmaceutical compounding cleanroom with smooth white wall panels, a flush ceiling with filter modules, and a stainless steel work table

Inside the structures the surfaces are smooth, the ceiling plane is flush, and the openings are controlled. Everything that has to be cleaned is a wipeable panel face rather than a painted, taped drywall joint.

Return on Investment

The first return on a modular cleanroom is schedule. Panelized structures are manufactured while site preparation happens and assembled in days rather than the weeks a conventional build occupies. For a compounding pharmacy, weeks of construction inside the building are weeks of constrained operation, and that constraint costs revenue that never appears on a construction invoice.

The second is trade coordination. A modular system arrives as one engineered package with its walls, ceiling deck, doors, windows, and electrical rough in already designed together. A stick built equivalent needs framers, drywall crews, painters, ceiling installers, and electricians sequenced by someone, and every handoff between them is a place where the schedule slips.

The third is the asset itself. Drywall rooms are an expense that becomes part of a building the pharmacy may not own forever. A demountable cleanroom is equipment. It can be extended, reconfigured into a different room layout, or dismantled and re erected at another address, which changes how the investment is treated when the business grows.

The fourth is service access. Because the deck is walkable and load rated, filter changes, lighting work, and mechanical service happen from above rather than from inside the clean space. Every service visit that does not require gowning up and interrupting compounding is time the pharmacy keeps.

Project Process

1

Define the Process

Map what is compounded, what has to be separated, and how people and materials move.

2

Survey the Building

Confirm slab condition, available clear height, and the space the structures can occupy.

3

Engineer the Package

Lay out rooms, ceiling heights, doors, windows, pass throughs, and the load rated deck.

4

Approve Drawings

Review the full submittal set before anything is manufactured.

5

Manufacture Offsite

Panels, doors, windows, and deck are built and finished in the factory.

6

Assemble On Site

The structures go up inside the building without wet trades or site painting.

Serving Pharmacies and Laboratories Across Sandy and the Wasatch Front

This project is in Sandy, Utah, in the south end of the Salt Lake valley, which is also home ground for Labs USA. Being local matters on a cleanroom project because the structure has to fit a real building. Slab flatness, actual clear height under the roof structure, column positions, and the route materials will take on assembly day are all things measured in person rather than assumed from a drawing.

Labs USA supplies cleanrooms, laboratory casework, fume hoods, work surfaces, and exhaust ventilation to pharmacies, laboratories, and manufacturers across Sandy, Draper, Murray, West Jordan, South Jordan, Lehi, Salt Lake City, Provo, and Ogden, and works on laboratory and cleanroom projects nationwide. The Wasatch Front has a dense cluster of pharmaceutical, nutraceutical, medical device, and diagnostics operations, and the same question comes up in most of them: how do you create controlled space inside a building that was not designed for it.

Related work includes modular cleanrooms for manufacturing and life sciences, lab furniture and casework for the interiors, laboratory tables for weighing and preparation stations, and laboratory fume hoods where chemical handling is involved.

Frequently Asked Questions

What is a modular hardwall cleanroom?

It is a prefabricated room system built from rigid insulated wall panels on a steel frame, with its own ceiling deck, doors, windows, and electrical rough in. It is manufactured offsite and assembled inside an existing building.

Why would a compounding pharmacy choose modular over conventional construction?

Speed, cleanliness during the build, and flexibility afterwards. Panels arrive finished, so there is no drywall dust, taping, or painting inside the pharmacy, and the structure can be reconfigured or relocated later instead of being demolished.

What does a pass through chamber do?

It is a double door cabinet built through the cleanroom wall so materials can move between areas without anyone walking through and without a room door opening. It reduces traffic across controlled boundaries.

Can you walk on top of a modular cleanroom?

You can when the system is specified with a load rated structural deck, as this one was. The deck carries filtration and lighting and supports service access from above, which keeps maintenance out of the clean space.

How long does a modular cleanroom take to install?

Manufacturing runs in parallel with site preparation, and assembly on site is typically days rather than the weeks a stick built equivalent takes. Exact timing depends on the size and complexity of the package.

Can a modular cleanroom be expanded later?

Yes. The panel system is demountable, so rooms can be extended, subdivided, reconfigured, or dismantled and re erected at a different address.

Does Labs USA supply softwall cleanrooms as well?

Yes. Softwall enclosures suit temporary and lower classification work at a lower cost. Hardwall systems suit permanent, rigid, cleanable installations like this one.

What else goes inside a pharmacy cleanroom?

Typically stainless or epoxy work surfaces, casework, storage, and in some cases containment ventilation. Labs USA supplies the interiors as well as the structure.

Need Controlled Space Inside a Building You Already Have?

Labs USA engineers modular hardwall and softwall cleanrooms, then furnishes them with the casework, work surfaces, and ventilation the process actually needs.

Get a Free Quote Call (801) 855-8560