Plan Your Wastewater Lab Project the Right Way

Renovating or building a wastewater treatment plant laboratory is a complex project with regulatory, safety, and procurement requirements that differ from typical facility work. Missing a critical planning step can mean costly change orders, compliance gaps, or a lab that doesn’t support your testing needs.

This planning checklist covers every phase of a wastewater lab project — from initial needs assessment through installation and commissioning. Use it to ensure nothing gets overlooked.

Phase 1: Needs Assessment

Regulatory Requirements

  • ☐ List all current NPDES permit parameters and required analytical methods
  • ☐ Identify any upcoming permit changes or additional parameters (check with state agency)
  • ☐ Document current and anticipated PFAS testing requirements
  • ☐ Review state lab certification requirements (if applicable)
  • ☐ Confirm compliance standards: OSHA, EPA, state health department

Current Lab Assessment

  • ☐ Document current lab square footage and layout
  • ☐ Photograph existing casework condition (for funding applications)
  • ☐ List all failing, damaged, or inadequate furniture and equipment
  • ☐ Identify safety hazards (inadequate ventilation, corroded surfaces, insufficient chemical storage)
  • ☐ Document current sample volume (daily, weekly, monthly)
  • ☐ Project future sample volume (3–5 year horizon)
  • ☐ List all analytical instruments currently in use and planned

Operational Requirements

  • ☐ Define required functional zones (wet chemistry, metals, microbiology, instruments, sample receiving, storage)
  • ☐ Identify cross-contamination risks between testing areas
  • ☐ Determine if PFAS testing requires a dedicated zone with stainless steel casework
  • ☐ Assess need for phased construction (can the lab shut down or must it remain operational?)
  • ☐ Identify staff workspace needs (desks, data entry, reporting areas)

Phase 2: Space Planning & Design

Layout Planning

  • ☐ Create functional zone layout with logical sample flow (receiving → prep → analysis → data → waste)
  • ☐ Separate incompatible activities (acid digestion away from sensitive instruments)
  • ☐ Plan balance/weigh room isolated from vibration and HVAC drafts
  • ☐ Design microbiology area with separate clean zone
  • ☐ Locate chemical storage accessible but separated from lab work areas
  • ☐ Include emergency eyewash and safety shower within 10 seconds of travel from any work area
  • ☐ Plan for ADA accessibility requirements

Casework & Surfaces

Fume Hoods & Ventilation

  • ☐ Determine number of ducted fume hoods needed based on testing methods
  • ☐ Specify hood interior material (polypropylene or epoxy for acid service)
  • ☐ Plan exhaust fan capacity and ductwork routing
  • ☐ Determine if VAV system is cost-effective (generally yes for 3+ hoods)
  • ☐ Ensure HVAC system can provide make-up air for all exhausted air
  • ☐ Plan for 6–12 air changes per hour in lab spaces
  • ☐ Maintain negative pressure in lab relative to adjacent spaces

Utilities

  • ☐ Map electrical requirements: dedicated circuits for instruments, emergency power for refrigerators/incubators
  • ☐ Plan compressed gas supply: air, nitrogen, argon for analytical instruments
  • ☐ Design DI water distribution system with adequate flow rate
  • ☐ Plan hot and cold water supply to sinks and equipment
  • ☐ Map data/network connections at instrument locations for LIMS
  • ☐ Plan waste drainage: acid waste neutralization if needed

Phase 3: Funding & Procurement

Funding Sources

  • ☐ Check Clean Water State Revolving Fund (CWSRF) eligibility — contact state administering agency
  • ☐ Investigate EPA PFAS/emerging contaminant grants (Bipartisan Infrastructure Law funding)
  • ☐ Check USDA Rural Development programs (if community under 10,000)
  • ☐ Include lab renovation in facility Capital Improvement Program (CIP)
  • ☐ Document project need for funding applications (condition photos, compliance gaps, safety issues)
  • ☐ Submit project to state Intended Use Plan / priority list (annual deadline — plan ahead)

For detailed funding guidance, see our wastewater lab renovation funding guide.

Procurement

  • ☐ Determine procurement method: competitive bid (RFP), cooperative purchasing contract, or sole source (if justified)
  • ☐ Develop furniture and equipment specifications with SEFA 8 compliance requirements
  • ☐ Include chemical resistance test data requirements in specifications
  • ☐ Specify warranty requirements (minimum 10-year casework, 5-year hardware)
  • ☐ Include installation, delivery, and commissioning scope in procurement documents
  • ☐ Verify Buy American compliance if using federal funding (CWSRF, WIFIA, EPA grants)
  • ☐ Check cooperative purchasing availability to streamline procurement

Phase 4: Construction & Installation

Pre-Construction

  • ☐ Complete environmental survey for pre-1980 buildings (asbestos, lead paint)
  • ☐ Verify structural floor load capacity for casework and equipment
  • ☐ Confirm HVAC, electrical, and plumbing capacity for new lab loads
  • ☐ Develop phased construction plan to maintain lab operations during renovation
  • ☐ Set up temporary lab space if full shutdown is required
  • ☐ Coordinate furniture delivery schedule with construction milestones

Installation

  • ☐ Professional leveling and anchoring of all casework
  • ☐ Plumbing connections for sinks, eyewash stations, and DI water
  • ☐ Electrical connections for fume hoods, instruments, and outlets
  • ☐ Gas connections for compressed air, nitrogen, argon
  • ☐ Fume hood commissioning: face velocity testing, ASHRAE 110 verification
  • ☐ Verify all safety equipment (eyewash, shower, fire extinguisher) is operational

Commissioning

  • ☐ Walk-through inspection of all casework, surfaces, and hardware
  • ☐ Verify all fume hoods meet specified face velocity
  • ☐ Test all utility connections (water, gas, electrical, data)
  • ☐ Confirm ventilation system provides required air changes
  • ☐ Document all installed items with serial numbers, warranty information, and maintenance schedules
  • ☐ Train staff on new equipment, fume hood use, and safety features

Get Expert Help With Your Project

Labs USA provides free planning support for wastewater lab projects at any stage:

  • Free lab design: CAD layouts optimized for your facility’s footprint and workflow
  • Furniture specification: Material selection matched to your specific testing methods
  • Cost estimates: Preliminary budgets for funding applications
  • Procurement support: Specification-ready documentation for municipal RFP processes
  • Professional installation: Phased delivery and setup to minimize lab downtime