Professional Lab Casework Installation
Proper installation determines whether your casework performs as designed — or creates problems from day one. Labs USA provides professional installation by factory-trained crews who understand laboratory casework, utility integration, countertop systems, and the precision required for a functional laboratory.
Every installation includes site preparation verification, cabinet placement and leveling, wall anchoring, utility rough-in coordination, countertop installation, hardware adjustment, and a final walk-through with your team. We handle everything from receiving dock to first use.
Installation Process
Pre-Installation
Site verification, floor leveling check, utility rough-in confirmation, delivery coordination, and installation schedule.
Cabinet Placement
Base cabinets positioned, leveled, shimmed, and ganged together. Wall cabinets mounted to studs or blocking with seismic anchoring.
Utility Integration
Plumbing connections for sinks and cup sinks. Gas connection points. Electrical raceway installation. Vacuum and air line routing.
Countertop & Finish
Countertop placement and seaming. Backsplash installation. Hardware adjustment. Final cleaning and punch list walk-through.
Installation Timeline
| Project Size | Typical Duration | Description |
|---|---|---|
| Single room (400 SF) | 2–3 days | 8–15 cabinets, 1–2 sinks, wall cabinets |
| Multi-room (2–4 labs) | 1–2 weeks | 30–60 cabinets, multiple sinks, utility connections |
| Full floor / building | 2–6 weeks | 100+ cabinets, complex plumbing, phased with other trades |
Frequently Asked Questions
Can Labs USA install in an occupied lab?
Yes. We regularly install casework in active laboratories. We plan around your operations — working nights, weekends, or in phases to minimize disruption. Dust containment, noise mitigation, and safety protocols are standard for occupied-space installations.
Does installation include plumbing and electrical?
Labs USA coordinates plumbing and electrical connections during installation. For new construction, we work with your plumber and electrician. For renovations, we can provide complete utility connections through our trade partners.
Do you remove old casework?
Yes. Labs USA handles demolition and removal of existing casework as part of renovation projects. We dispose of old cabinets responsibly and can coordinate asbestos testing for older installations if needed.